Book a demo

Make capital projects, outage response, and regulatory collaboration repeatable.

Turn every outage, capital project, and regulatory filing into a structured, auditable Microsoft 365 workspace — governed from the moment work begins.

The repeatable work.

Outage and storm response, capital projects (grid modernisation, renewables build-outs), interconnection and rate-case filings.

The project lifecycle.

Rate case / interconnection request → planning → capital project → commissioning → operations. Permits and approvals should feed planning. Planning should feed construction. Commissioning should feed operations.

Where collaboration leaks.

Outage response coordinated in ad-hoc chats instead of structured incident workspaces — decisions get lost and evidence has to be reconstructed afterward. Capital-project workspaces are fragmented across EPC, owner's engineer, and utility PM, so no one has the full picture. Regulatory filings are assembled from email chains with no structured evidence workspace, meaning teams spend weeks collecting what should have been captured as the work happened.

What nBold changes.

A ready-to-work incident workspace for every outage.

Structured channels, roles, checklists, and communications templates — provisioned the moment the incident opens, archived with a complete evidence record when it closes.

Context that carries from interconnection through operations.

Permit workspaces feed planning. Planning feeds project execution. Commissioning feeds operations handover. Each stage inherits what came before.

A filing workspace where evidence is captured as work happens.

Regulatory filings stop being a scramble. Evidence is in the workspace from day one, not reconstructed from email threads at the filing deadline.

Every outage, every capital project, every interconnection request starts with a ready-to-work workspace — and the filing workspace holds the evidence generated throughout.

Proof points.

Multi-party governance · SharePoint site provisioning · Audit trail · Lifecycle archival · ISO 27001 certified · SOC 2 Type II certified · Microsoft 365 native.

$2T+
Global clean-energy investment will exceed $2T in 2024, double fossil investment — unprecedented delivery pressure on utility ops.
IEA, World Energy Investment 2024
69%
of energy/utility capital projects experience cost or schedule overruns.
EY, Global Capital Projects Survey 2023

Repeatable collaboration for work that cannot afford to improvise.